Makaw Scaffolding was entrusted to design, install and certify one of the largest scaffolding structures ever carried out in Malta till to date in order to serve as a temporary support structure for the construction of steel and glass roof within the newly constructed Malta International Contemporary Arts Space - MICAS. The scaffolding structure has been designed to receive a distributed load of 4,000kg each 3 meter point load whilst also providing a fully boarded platform in order to provide safe access for the operatives to install and finish all the steel work which was to be connected on a section by section basis. This project required the successful implementation of Makaw Scaffoldings core strongholds which are : 1)- Pre commencement design and engineering of the structure 2)- An extensive stockpile consuming in exceess of 1,200 tons of Layher allround equipment at one instance 3)- Execution by fully accredited and dedicated scaffolders which are some of the best within the Mediterranean region
Services used in this project listed below